RitsuScope
Map locations on the drawings, measure quantities and model the building in 3D.
Takeoff · structure & MEP · location breakdown · 3D
RitsuFlow™ connects quantity takeoff, estimating, Lean planning and field control on the same locations and work packages — so the bid you win becomes the plan you build.


Start with the one you need. A company can license only takeoff and estimating, only project control, or the whole flow.
Map locations on the drawings, measure quantities and model the building in 3D.
Takeoff · structure & MEP · location breakdown · 3D
Price takeoffs with your library, send proposals and turn won bids into projects.
Price book · BDI / markups · proposals · win/loss
One project record shared by every workspace: team, scope, locations and history.
Team · scope · locations · history
Plan, sequence and make work ready. Control constraints and protect the flow.
Master plan · lookahead · constraints · weekly plan
Take the plan to the field. Run the day, capture production and measure performance.
Daily reports · attendance · timecards · field data
Calibrate the PDF, draw walls, ceilings, floors and openings by type, and RitsuScope computes areas, lengths and the framing — studs, tracks and boards — level by level.



Nothing is typed twice. The locations you measure are the locations you price, plan and control.
Use RitsuFlow only for takeoff and estimating, or connect it to planning. The same price engine reproduces the TCU BDI formula and US markup stacks.

RitsuFlow checks Make Ready conditions before an activity enters the weekly plan. Constrained work stays visible, but it cannot be committed until its constraints are cleared.
RitsuFlow™ is developed and commercialized by ExcelisPro, a Brazilian management consulting firm focused on construction planning, cost and production control.
More than seven years in construction project management and controls — cost, schedule, scope and risk — including industrialized construction (cold-formed steel).
We're selecting a small group of contractors and project teams to use RitsuFlow on live work, from the first takeoff to weekly control.